Public Transport Infrastructure & Engineering Management Services
With over 25 years of experience in the industry, we are committed to providing outstanding engineering service. CPEng, FIE Aust. NER, RPEQ RPEV certified.
Ensuring that your projects are developed, designed and delivered to meet the operational requirements
Projects succeed or fail in large part due to inadequate project requirements and scope definition. Time spent at the front end of projects to ensure clarity of purpose is rarely wasted. Learning from others, so that we avoid reinventing the wheel is a key area where N2SR is different.
N2SR Services
From project definition and development to strategic fit and integration management of the transport network, N2SR can bring real value to major projects.
Embedding true Value Optioneering and Engineering at all stages in the project lifecycle and identifying repeatable and productionised integrated designs to maximise reuse and minimise bespoke solutions.
Integration of railway systems is a vitally important aspect of complex projects. Post completion reviews of major projects repeatedly highlight areas where integration was not adequately considered at the start, nor maintained during design and delivery. this can lead to significant cost escalation and delays top handover and commissioning.
Strategic Planning and Project Development
Ensure that the planned project meets concept of operations and strategic goals. Now is the time in the project lifecycle to change your mind about what you want.
Value Optioneering
Re-evaluating the preferred option, to identify one which more effectively addresses the final operational outcome, improves the public interface / urban realm benefits and meets constructability and maintainability challenges can be another great decision.
Design Reuse
Don't start with the question "What do we need to design?"
Start with the question "who has done this before?"
And start there.
Design for Production
Design for fabrication and construction is a vital part of achieving project delivery efficiency targets. Designers often do not take into account how the asset is to be fabricated or constructed, instead relying upon the Contractor to solve this issue. Great design embeds production efficiencies and constructability right from the beginning.
Design Integration
An integrated design approach from day 1 can help to avoid those painful and costly design clashes and lack of consistency with regards to the final outcome. N2SR has been working in integrated 3D design for around 15 years, and has significant insights into the value of a fully integrated approach.
The integration of complex systems must be commenced early in the project lifecycle, even in the planning phase, for example by simplifying the proposed configurations where possible.
Maintaining a configuration baseline, reflective of the Concept of Operations, against which all designs are tested is an effective way of ensuring operational requirements will be met.
Digital Engineering
Using Digital Engineering, with a common database of information, used by all project and asset team members offers massive value across the supply chain. N2SR has been working with various suppliers such as 3D survey, 3D design modelers and Asset Management systems to drive full integration across projects and future asset management workflows.
Recent Projects
Strategic Design Competition
Cheltenham Station UK
Railway Grade Separations
Worked with the Victorian State Government’s Level Crossing Removal Project and lead the Government (Client)-side planning, design, Engineering and acceptance aspects of three road / rail grade separations, in Werribee, Hoppers Crossing and Williamstown.
The challenges at the three locations were all different, but using extensive railway and civil engineering planning, technical innovation and value engineering experience to help identify and solve emerging design assurance issues, minimise operational and maintenance impacts, and identify and address site-based technical, constructability, integration and quality issues
Airport Capacity Improvements ASIC Certified
NSW
Project Efficiencies
Taking a holistic approach to maximise the benefits and strategic fit of projects
Railway Tunnel Systems Integration
We have experience of railway tunnel maintenance and upgrades in the United Kingdom and New Zealand. With N2SR we identify the root cause, solving the problem rather than simply treating the symptom. Ensuring systems are integrated and meet operational requirements.
To optimise tunnel workstream delivery, we procured and rehabilitated modern equipment for track renewals and maintenance activities and ensured fit-for-purpose design requirements were implemented, to bring the project back onto schedule and within cost forecasts. The result of this approach delivered significant production efficiencies, delivered within costs and ahead of program.
Contact Us
Address
8 Edward Street, Moree NSW, Australia
Phone
0424831416ABN
95204633511